Sunday, 31 October 2010

The big digger

It's been a busy weekend.

I spent a day or two preparing the armaflex pipes and getting them into the conduit. As the pipe lengths weren't as long as we needed, there are two joins inside the conduit. I made the joints - first attempts with corrugated stainless pipe - then pressure tested them with a footpump up to 3bar. They didn't leak. My first attempt at insulating the joins proved to be too fat for the conduit. I should have known that 110mm conduit has the outside diameter of 110mm: inside it's more like 95mm.

Eventually we (Paul and I) succeeded in pulling the armaflex through the conduit. This was where we'd got by Thursday lunchtime:

Photobucket

We then spent Thursday afternoon digging a hole in the ground at the end of the barn, and then knocking a hole through from the boiler room to the hole. This took time, but luckily the wall was reasonably solid, and held together well even with a hole in it. The first spadeful disturbed a fire salamander, a handsome creature:

Photobucket

We found him a new hole to retreat to. And then Paul went and washed his hands: these animals secrete quite an unpleasant poison as a defense mechanism. But they do a lot of good in the garden, eating all kinds of invertebrates (and some smaller rodents too).

So then we had a little hole .......

Photobucket

.... and we just had to wait for the man with the digger. He arrived with an enormous lorry and the digger on a trailer behind it. The digger turned out to be slightly to wide to get along the lane where it is narrowest (near our hole) so his first job was to carve away part of the bank. But once through it didn't take long before he was working his way back down the hill - and cutting through some satisfactorily solid bits of rock just by the corner of the barn, which makes me think we don't have to worry much about the barn's foundations.

Photobucket

As he couldn't leave while the trench was open, we put the conduit in, and he filled it back up (working well after dark - he finished about 8pm).

Next day the lane looked like this (muddy):

Photobucket

And the back garden looked a bit like the western front - Nicolas who is reconnecting the pool pipes to the new shed couldn't finish in the dark, so that his trench has been left open. The remains of the old buried housing for the pump and filter are just to the right of the new shed (elevated by Paul to a "salle technique"): there wasn't much left intact after the digger ripped it out of the ground. We'll have to put up with these piles of mud and rocks for a day or two, but hopefully it'll all be done very soon.

Photobucket

We also finished off the roof on the shed: it has the ridge on, and is sheeted up at the back too. Next job: install the solar panels. Though I might just pressure test the piping again. It would be a disappointment if it turned out that heaving the pipes through the conduit had sprung the joins open. And digging it all up again would be rather tricky.

Thursday, 21 October 2010

raising the roof

I collected the roofing panels this morning, ten days later than promised, and this afternoon we started putting them on - two complete novices, Mikey and I, but it didn't seem to be too hard.

Photobucket

You can see that we have an over-long panel, the one on the right. We have one left over that is the right size, so we'll probably swap them rather than try to cut the one already fixed. The colour looks slightly different too, but that will hardly matter as almost the whole of the roof will be covered by the solar panels.

Photobucket

Mikey was invaluable: I couldn't have got them fixed by myself. The other parts of the roof (edge-pieces, and the ridge) should be a lot easier, though if Mikey is still here I'll try to rope him in again. The edge pieces will give us the extra couple of centimeters we need - had I known the size of the roof panels, I'd have made the roof to fit them, rather than just a bit too wide. I'd also have spaced the rafters differently. Virtually all of the coachbolts project on the inside (as they miss the rafters) and will need to be cut off with a grinder before I stab one through my head.

You can see that we were working until quite late ....

Photobucket

but it was surprising how quickly we got this main part of the work finished. I have to work out later how to get to the upper part of the roof to put in the final bolts. It can be done from a ladder on the right, but on the left the slope drops away too much.

Photobucket

The roof has been uncovered just a bit too long - the roofing felt isn't designed to be left exposed to sunlight, and it is already showing some signs of crumbling.

I don't imagine that professional roofers use clamps to hold the panels in place while putting the coachbolts in, but we found that it works, and really that's all that matters. And although we have a slight tilt by the time we got to the final panel, it's so little that they will pass pretty well for vertical.

Tuesday, 28 September 2010

Treating myself .....

and occasionally the woodwork, with a coat of linseed oil.

The internet reveals a large number of available wood treatments, at various prices. At the top end of the market and if you are looking for something "natural", you'll find a number of enthusiasts for "Danish Oil". Looking further, it turns out that the manufacturers of Danish Oil never tell you the precise mix of ingredients. Those that say what it contains sometimes admit that it is (mostly) linseed oil. If it also has tung oil in it (and that appears to be expensive) you can be fairly sure it doesn't have much. So I've been using a simple mix suggested by the local carpenter: 2/3rds linseed oil, 1/3 turps, and a small spoonful of a drying agent. The turps makes it penetrate better, and the drying agent .... er ... helps it dry. I have trademarked this subtle blend of a natural oils and rare gums as "Denish Oil", and its main users find that it really is very effective. And compared with most "Danish" oils, it's dirt cheap, which really clinches it.

Here's the bedroom door, after treatment:

Linseed

It has brought out the grain very nicely. The one curious effect is that it leaves newly planed wood almost its original colour, but if applied to wood that has been exposed to the air for a few years the final colour is very dark. In the case of old oak, almost black.

I've also been oiling the staircase: it has a wonderful shiny polished surface now. I am not sure if this a good idea. If it isn't I'll let you know.

Saturday, 25 September 2010

At work outside

Each door seems to take about three days to do (not full days, obviously, there's a boredom factor to be worked in somewhere), and I've just done day 2 of the final door. I set up what I hope will be a temporary workshop in the hangar. Originally this was an open-sided barn used for carts and other agricultural machinery - now it's the garage for the cars and where I keep the old timber.

In this picture I am using the router. The door planks need to overlap so there aren't any visible cracks through the door, so I put a right-angled notch into the edge, making it L-shaped there. And the next plank has an L the other way up.

Rout1

What's stacked at the back is (about a quarter of) the original floor of the barn - I'd hoped to be able to re-use some of this wood, but it is in quite poor condition, so it may end up as firewood. But I've used quite a bit of it to make a temporary foor where I'm working - it's reasonably level, unlike the earth floor of the hangar.

The picture below shows how I'm sharing the workshop with the cars. I've clamped down the board which I'm working on by using an ingenious arrangement of flexible boards (cheap cladding) and small clamps like large clothespegs. It isn't possible to use a proper clamp (even if the ones I have were in working order), as they foul the router. They are just a bit too big for it to pass over the top.

Rout2

Today I got as far as assembling the boards - the edges have to be planed straight by hand, as none of the boards was quite true - and cutting them roughly to length. I will then cut them exactly when the door is finally assembled.

Here's what will shortly be the bathroom door:

Assembled

The middle cross-piece is sitting loose on top, not yet positioned, but it's clamped together using heavy boards to bring the surfaces as level as possible.

And the last picture shows the cross-piece held firmly in place (but not really clamped) ready for the screws to go in. That was about as far as I got -

Clamped

I think you can see that these are good oak boards. You can also see the over-sized T-square I bought last week. It helps to get the cross-piece reasonably level before it's screwed on, but as the ends of the boards are not yet level there's no other way to do it. This is the voice of experience - the cross-pieces on the shower room door are visibly not quite level. I call it a program of continuous quality improvement. So by the time I've finished I'll have learnt how to do it properly, by making all the mistakes one by one.

Thursday, 23 September 2010

lift the latch .... and come in

This is the beta test version of the latch on the bedroom door - it includes a doorhandle. The other side of the door has the more normal type...

doorhandle

I've not yet filled the screw holes, so there's still a little more work to be done before I start making the last of the interior doors. But after that, it will be time for boiling oil again.

The sunny autumn has finally given way to thunderstorms and a lot of rain. Good thing I'm working indoors.

Wednesday, 22 September 2010

Him indoors

I did these two doors - not the one in the middle - over the last few days. I haven't yet treated them so at present there's a delicate smell of oak which will shortly be replaced by a strong smell of linseed oil. It's nice to have a door for the shower room - this morning I'd left it open and found inside the shower there was one of the cats with most of a (small) rabbit and a certain amount of blood and fur. Fortunately it all cleaned up nicely. I'm not sure whether to encourage the cat to eat what it has killed in there - better than on the stairs from the point of washing away the bloodstains - or try to persuade it to eat outside.

Hall doors

This is the big door for the bedroom, in place. It's a good fit too, and I didn't need to do a lot of adjusting. Just the same, I had it on and off its hinges at least six times.

Big door

This is the view from inside the bedroom, and you'll notice I haven't yet made the catch for the door. Tonight, to keep the cats out, it'll be wedged shut...

Just as big


This is a close-up of the catch in the shower room. The filled screw holes show up much more with the camera flash than they do in normal lighting - in daylight they hardly show at all.

Latch

I've extended the top of the guide by about a centimeter, with the idea of providing something to pull the door with. It would save putting a handle on the inside of the door. In fact the one centimeter extension isn't quite enough, and for the bedroom door I'll make it a little bigger. If we don't like it it will be very easy to cut it off.

Tuesday, 21 September 2010

Heavy doors

I've been working on the interior doors. I bought a half-cubic meter of seasoned oak planks, mostly just over 2 meters long and between 15 and 30 centimeters wide (but all about 3cm thick). These were from M Clot, who used to run a sawmill in Maurs until a few years ago, and who, having retired, is selling off the old stock. It's good stuff, though there are some woodworm holes.

I'm gradually getting better - or, if not actually better - more systematic at doing the doors. They are a fairly simple pattern, but just the same they are heavy. The biggest one, nearly a meter wide, is not quite too heavy for me to lift, but the combination of weight and size mean that I can't carry it any distance at all. So I've been moving it around on a sack barrow:

On the trolley

It goes without saying that the wooden door won't go through the outside glass door on the barrow: it's too wide, and you can't wheel it in sideways (not by yourself, anyway). So the last bit was dragged along the floor.

It's surprising how often it has to go back to the workshop. I'm not yet good enough to make it fit the aperture first time (though this one came very close), so I make it a little over size, put it in the doorway, and then pencil round it and cut it down to size. Then it has to go back to have the hinges put on in the right places. There's a fair amount of sanding annd planing to fit, too. In this case, as it is so heavy, I've bought bigger hinges, and I just hope the door itself is strong enough to support its own weight. We'll see tomorrow. I'll put some pictures up then showing a bit more detail.

Friday, 10 September 2010

Getting plastered

In fact, rendered, but almost as messy.

I've had a first ever go at putting a roughcast lime render onto a wall. I rather hope it is a wall no-one will ever look at (and maybe a second coat will even things out a bit). But the render is still there this evening.

Here's how it looks:

Lime roughcast

It's a purely sand/lime mix, approximately 2:1, and it's mixed reasonably wet. I applied it by flicking it off the trowel, which I know is the approved manner. I have a feeling I should have tried to level the surface at some point before it was completely dry, but I was so pleased seeing it stuck to the wall that I didn't. I couldn't face the prospect of seeing it all slide off. When you flick it on, it's surprising how often successive plops end up in exactly the same place, giving a very amateurish peaks and valleys effect. I hope that with more experience I'll be able to throw it where I want it. Trouble is, if you don't throw it hard enough it falls off (and too hard, it bounces off), and there's a trade-off between speed and accuracy.

I ran out of lime, so tomorrow I'll get some more and try to finish this wall and start the next. I am fairly sure you are supposed to do something clever at the edges, so I'll try to work out what that is before I start next time.

But what the hell, it looks a lot better than concrete blocks!

Saturday, 21 August 2010

A hot week's tiling

The tiles on the terrace (over the silo) are finally finished. It was very warm work, but working with cement, with grout, and buckets of water is a very effective exfoliant, so now I have nice clean hands. With nice clean blisters.

It was a good thing that I left the hump untiled until after I'd worked out how to tile it. In the end it only needed four easy cuts to produce a tiled area that is a couple of centimeters higher than the surrounding area. Like this (these are all clickable thumbnails - click on them for high-res pictures):

the hump

I was surprised to find that the grouting was such vigorous work, even though I didn't do much at a time. It was quite difficult to leave the grout long enough to dry sufficiently in the gaps between the tiles, but not so long as to be impossible to clean off the surface.

grouting

In the background is the man from the supermarket come to fix our 9-week-old washing machine (bearings shot). The grouting took me four days, though of course since it was so hot I wasn't exactly working full-time (though I do remember one evening when I finished at 8pm). In between I was getting the red car imported and legal and insured in France. I had to replace its shock-absorbers which passed an English MOT but failed the French one - where they actually test them. In the UK they just check to see that they are present and not obviously leaking.

But the finished result (of the tiling) does look pretty good (the car still looks shabby but with French number plates):

Done&dusted

Of course most things look nice with pots of flowers and sunshine, and what's more the peaches over the terrace are ripe and ready to pick (and not wormy either, unlike the apples). It's possible to see a small puddle in the middle: I flooded it to see where the water stayed. There was a similar puddle before I started tiling, but I tell myself that this one is smaller. In any event the surface is now pretty certainly waterproof. If there's rainwater getting into the silo now it will only be through the walls.

And in the background of all three pictures you can just see the youngest grandson's nappies on the line: he's on his way home today, but right now he's having a swim.

Saturday, 7 August 2010

The blockhouse is now nearly done

After two days of very hard work in hot weather, the blockhouse is just about done. After putting up the rafters and nailing on the planking I discovered that a small roof like this is normally held on to the building just by its own weight. So I tied it down by using metal strips, fastened to the rafters at one end and to the concrete belt on top of the wall at the other. Hard work with the masonry drill. I then thought that it might be a good idea to seal up the bottom edge of the roof - to discourage plants from coming in - with a concrete infill. This is it:

Photobucket

The tops of the metal strips just show above the concrete. They aren't really heavy duty angles - I'm using up the hangers for the suspended ceiling, as I had to buy two large boxes of them, and I had most of the second box left over. However the concrete is going to help weight down the roof.

The concrete goes all the way along on top of the wall - I did have to fit wooden strips to stop it falling straight out on the ground, and these too will make the roof a bit more solid. They are fixed securely into the rafters. Here's a general view of the concrete infill:

Cement2

After that I screwed the missing planks into place - all the rest are nailed but I didn't want to hammer right next to the wet concrete. I didn't think it would harm the mix per se, but that there was a risk that I might dislodge the shuttering which is only wedged in place. So here we are:

Roofed

Apart from shifting the tools and general builders' mess, there is one more job to do, which is to put a bit of roofing felt over it. In a week or two there will be metal sheeting over it, the final layer below the solar panels (which have still not even been ordered .... )

Tuesday, 3 August 2010

work in progress

The blockhouse is still as it was - summer visitors, and it's now August, so not a lot gets done. But I have started tiling the silo outside the front door, so here is what progress I've made over three days:

Day1

Day2

Day3

The gap in the tiles is where there was a concrete trapdoor down into the old cistern: that part is now two or three centimeters higher than the surrounding area, so I will have to dissect the tiles to make them sit as flat as possible.

It is possible to lay tiles when it is raining, as it was on Sunday, but it's more difficult. The adhesive doesn't stick to the ground, so when you try to spread it, it slides around in a lump instead. It doesn't wash away though, so the tiles are well stuck down.

Saturday, 10 July 2010

belt up

I've finally put the belt (ceinture) up round the top of the block house.

It was an exceptionally hot day when the shuttering went up, and when we poured the concrete. The shuttering contains reinforcing bars (at last, a way to get rid of the extra metals left over from building the barn), and there is also special square reinforcing down the corners to help hold them together. Personally I think cement works pretty well by itself.

shuttered - shattered

Assembling the shuttering took at least as long as mixing the concrete and tipping it in, and although shuttering always looks very Heath Robinson, the finished result is usually surprisingly good:

belt up

In the top right hand corner it's just possible to see the reinforcing bars for the corner - they will have to be cut off flush with the surface when the concrete is a little harder. And in the top left hand corner is that useful standby, the scrunched-up cement bag, used to plug a hole where getting a bit of wood in just wasn't possible.

Next, the rafters and boarding it out.

Monday, 5 July 2010

the end is in sight

mine, possibly. But the wall is now almost finished. There's a little more pointing needed on the left, and some repairs to the plinths under the wooden pillars, and some work inside (when I succeed in removing the 200 concrete blocks stored there), but that's just about it.

The Wall

The two door pillars are the same size, and the plinths they stand on are the same too, and are level with each other. It's odd that it doesn't look like it.

The new wall is definitely an improvement on this:

Hole

It's been back-breaking work, so I'm pleased it's about over. And I quite like the result, which - although far from professional - is good enough to pass.

Sunday, 4 July 2010

going up

The wall has taken quite a while to get to where it is now, which I imagine has something to do with the extremely hot weather we've been having. The pool has reached 30 degrees, unheated, and that's definitely a sign that it's summer.

It's been a bit of a slog, and some of the stones have been a bit heavier than I can really manage, but it doesn't need much more now. Just that top left hand corner:

almost done

It's reassuring to think that now there is something more holding up this edge of the concrete slab - or at least, there will be when the mortar hardens up a bit. Before it was relying on the reinforcing rods in the concrete - inch-thick rods, it's true, but just the same supporting the slab at the edge must be a good idea.

I don't think I've got quite enough of the lime to both finish the top row and do all the repointing, so it'll be another visit to Chausson on Tuesday

Saturday, 26 June 2010

A gap in the programme

I've had to hold up the work on the shed, so I thought I'd use some of the sand and rather old cement and lime to deal with a different problem, the hole in the wall:

Open silo

The wall that was here was knocked down by the previous owner to turn the rainwater cistern into what must have been a rather unsatisfactory garage for cars. When we bought the barn, all it contained was some large timbers and a freezer containing old paint pots. And a lot of spiders. The original foundations of the wall were still there except at the left hand end, where they had been cut through to pass the water and electricity into the barn.

Old foundations

So I mixed some concrete for the new foundations, instructed and assisted by the two older grandchildren:

Mixing it

I cut up one of those old timbers to make a doorway, probably the biggest and heaviest mortice joints I've ever cut, and got started building. The wood has been given a single coat of linseed oil, and it is a very tight fit (sledgehammer) under the concrete slab. I hope it doesn't move, as it won't really be held in by the wall.

First course

Once I started, the weather got hotter and hotter, and today I started early and gave it a break in the middle of the day when it was much too hot. By this afternoon I'd got up to this level, and it is beginning to look like a real wall:

Halfway

After beginning thinking that 10cm thick concrete blocks would do for the inside wall, I eventually decided that the 20cm ones would require less mortar, and put less stress on my back (all the mortar has been mixed by hand). Occasionally if the stone facing is a particularly large piece, I have to knock a hole in the concrete block to accommodate it. At this stage I am not sure if I actually have enough stone to finish it, but I am hopeful, particularly if I can get a few more of the bigger stones into the wall. The main problem is lifting them, and not dropping them so hard on the wall underneath that it damages what's already been built.

I've been using a lime mortar for the wall, more to use it up as it is getting a little old, but also because it should match the existing mortar. I've left wide gaps for pointing later, and with a bit of luck - although you will be able to see the joins - it should match up reasonably well. The bit on the right is likely to be a better match than the left, where the new wall meets a nicely squared corner of the barn.

Saturday, 19 June 2010

one more day ....

.... and it looks like this:

skeleton

The next job is to cast a reinforced concrete beam all round the top edge, linked in to the corners (which at present are hollow and which take a square reinforcing framework). So on top of the lintel over the door there will just be concrete, not block-work. The lintels over the windows have been finished slightly unconventionally, with a 10cm block put in sideways. Normally these would have cast concrete on top too. We'll presumably need to make the concrete quite a dry mix to deal with the 45-degree edges. This beam will ensure that the walls hold together. I rather imagine that it will be pretty well blast-proof too: Paul did say that the French norms for any kind of building are over-engineered.

The hole in the bottom of the front wall will eventually be filled in, but below it there is a corresponding gap in the foundation slab (there's another one that doesn't show on the right). This is where the pipes from the pool will enter, coming in through a trench. The invisible gap on the right will give access for the well-insulated pipes going back to the barn to heat our hot water.

The rafters (chevrons) for the roof then sit on top of the hoizontal runs of the concrete beam, notched to stop them slipping, the rafters are then close-planked, with some kind of watertight roofing on the planks and under the solar panels.

I cut the blocks myself over the lintels, and where they needed to be shorter to fit in the sides.

cutting

Oddly enough this was just about the first cut I did: after this one I went and got my safety goggles, as the concrete really does spray out in all directions.

The work - of mixing cement and cutting and carting around the blocks - has messed up the grass quite a bit, but there's plenty of rain on the way to wash out the cement, and I expect the grass will be knee-high before we get around to the next phase, in a couple of weeks time.

Thursday, 17 June 2010

solar heating on its way - in September

Today I was working with Paul to make the walls of the building that should - god willing, and much later this year - have the solar panels on its roof and the pool machinery inside.

My role is builders' labourer - fetching the blocks, sometimes mixing the mortar, bringing the sand and cement down from where they are stored, cutting the concrete blocks to size. Paul does the skilful stuff - getting the blocks level, upright, at right angles - in fact all the real building work.

But this is what it looks like now:

walls half way

The long wall at the front is now at its finished height (80cm). The solar panels will be angled back at 45 degrees to slope up to the other long wall, which when finished will be about two and a half meters high.

The building site is being inspected by the youngest grandson Isaac (asleep as usual, but he is only nine weeks old) with his mum, Jane. The walls you can see were just one day's work, and - as we also had to go down to the builders merchants to get more sand, more cement, and the timbers for the roof - it was really quite a good day. On the other hand I'm going to have to get yet more sand tomorrow (though we do probably have enough cement now).

By the end of the day the sun had come out and it was pretty hot, so I rather hope we've finally got to the end of this rather rainy patch we've had for the last week or so.

Thursday, 10 June 2010

Some work is progressing ... a bit

The windows all went back into the farmhouse in varying states of finish, and we painted and varnished them as time allowed for the first summer visitors. About the best I can say about these windows is that the more I have repaired, the better the standard of the repair. But "better" regrettably doesn't mean "good".


Here is a window whose bottom edge is now a good deal more solid that it was. In fact, before the repairs the bottom of that frame was loose and could be wobbled several millimetres back and forward - with a correspondingly loose pane of glass.

Exterior

The picture below shows the inside of the same pair of windows. The glazing bar at the top of the picture of the right hand window was similar to (or perhaps actually is) the one shown previously (May 25th) with a large amount of rot at the joint. The joint is now filled with the resin-based filler, and strengthened with a metal T-piece. The left-hand window was one I repaired last year and needless to say the repairs are much more visible.

Interior

The glass is now all in one piece, instead of several, and the putty is a good deal more secure. In fact, as we have now painted over the putty - previously it had all been left unpainted, and had cracked away - there is a chance that the glass will stay where it is and rattle a good deal less in the winds.

We have finally got around to starting the building for the solar panels at the end of the garden. I know that putting them at a distance from the house is not ideal, but I have some hopes that the extra distance will be compensated by the larger area, 10 m2. Eventually I imagine we will find out.

Yesterday, in pouring rain, Paul and I dug out the foundations and shuttered the hole - mostly Paul I'd say. By the afternoon the rain had made the ground so slippery that Paul was only just able to get his van up the lane behind the barn, and the pouring of the concrete was deferred for a day or two in the hope of better weather. I spent the afternoon shifting the concrete blocks for the walls down to the site - they had been delivered up by the farmhouse.

This is the present state of the work:

Foundations

There are four and a half tonnes (=250 blocks) of those blocks, shifted five at a time by wheelbarrow, and it has to be said my back is complaining about the hard labour yesterday. But the forecast is for a dry morning tomorrow and I have every hope that we'll get the concrete poured and the first row of blocks in place. The corner blocks - which are different from the wall blocks - accomodate steel reinforcing to tie them together. It is possible to see just one of the corner blocks edge-on in the picture, a little to the right of the top edge of the wheelbarrow, with the square hole at one end only, and you can compare these with the end-on views of the other 8 or 9 wall-blocks.

The intention will be to get these vertical reinforcing rods cast into the foundation slab, and then up a couple of levels of blocks, at each corner. The first layer of blocks will - I hope - be set into the concrete foundations before the concrete starts to harden.

Tuesday, 25 May 2010

but I digress

I wasn't actually doing any building work - I just decided that the 2CV van needed some attention. Most 2CVs are easy to work on, as you can go from this:

clothed

to this:

stripped

in ten minutes or less. And then all of the engine is accessible. Regrettably, it turned out that what needed to be done was something I couldn't do. There were engine/exhaust smells in the passenger compartment, and I had supposed that there was some leakage round the heads that could be cured by re-tightening them (and I could do the tappet gaps at the same time). But the heads were OK and the gaps didn't need changing. Instead there was an exhaust leak where an almost-new part had failed at a joint. It needs welding or - perish the thought - a new exhaust cross-box.

Oh well.

That can be added to the "jobs to be done on the 2CVs" list. This now includes quite a bit of painting, and a new speedometer cable for the red car.

In fact there has been some work going on around the farmhouse. I've been attacking - one might say bodging - the window frames which are really quite rotten at the bottom in almost every case. I've been using a resin-based woodfiller to make good, together with T or L shaped metal repair strips. I've tried to get these below the finished surface, using a router wherever possible, and then put the filler on the top so the metal doesn't show. Of course what does show is the filler itself, which has a rough surface. Still hopefully when the starting point is this

rotten

almost anything will be better, and in fact the end results are not too bad. Or, to be honest, too good. I hope that the window frames will stay together for a year or two - after which new windows might be possible - particularly since I have replaced ten or more cracked panes of glass in the ones I have repaired. I even discovered that the ones with a suspiciously regular crack - a straight line across the middle of a pane - had been deliberately cut that way in order to give a "crease" in the glass, as the frames had warped so much that a flat sheet wouldn't fit easily. But by building the rebates up a little with the filler I was just about able to manage.

Saturday, 1 May 2010

While you were away

I've been off in England since the beginning of April, and during that time there has been exceptionally little rain.

As a result, the grass seed I put down where the moat used to be (the trench outside the front door) managed to sprout - I'd been watering it - and then either wither in the drought, or perhaps get eaten by our neighbour's chickens. The end result was a lot of bare earth where I'd hoped for a pasture.

More worryingly, you leave your house unoccupied for three weeks and what do you find when you get back? Squatters!

Photobucket

This is the probably the same black redstart that raised a brood inside the barn last year, and is still annoyed that we have now shut the windows and plasterboarded over her previous nest site. You can still see the souvenirs she and they left behind on all our new woodwork.

As this mixing tray is hanging from the beam of my outside workshop, not quite above head height and close to the bench, I am going to have to be careful not to knock the nest out. And we'll have to hope I don't need the saw or the lead-light.

Followers